Solar to Power GM Volt Assembly Plant

GM is installing a photovoltaic solar (PV) array at its Detroit-Hamtramck assembly plant. The project is a partnership between GM and DTE Energy and will total 516-kilowatts – enough electricity to charge 150 EVs with extended-range capability each day for one year- for a total of 54,750 Volts.
Read Full Article